Syndetics cover image
Image from Syndetics

Control system migrations : a practical project management handbook / Daniel Roessler.

By: Material type: TextTextPublisher: New York [New York] (222 East 46th Street, New York, NY 10017) : Momentum Press, 2013Description: 1 online resource (xxiv, 192 pages) : illustrationsContent type:
  • text
Media type:
  • computer
Carrier type:
  • online resource
ISBN:
  • 9781606504451 (ebook)
  • 1606504452 (e-book)
Subject(s): Genre/Form: Additional physical formats: Print version:: No titleDDC classification:
  • 629.8 23
LOC classification:
  • TJ213 .R643 2013
Online resources:
Contents:
List of tables and figures -- Acknowledgments -- Foreword -- Preface -- About the author --
1. Migration project justification -- Determining your approach -- Defining ROI -- System failures -- Parts availability or obsolescence issues -- Difficulty integrating with newer applications and systems -- Reduced availability of support services -- Operational inefficiency -- Summary --
2. A comprehensive FEL -- Selecting your FEL resources -- Identifying key engineering deliverables -- Deliverable descriptions and content -- Important FEL decisions -- Summary --
3. Bid specifications and vendor selection -- Control system -- The control system functional specification -- Hardware and software requirements specifications -- Control system bid instructions -- Decision criteria matrix -- Selecting a control system vendor -- Engineering, procurement, and construction services -- Requirements definition -- A complete EPC bid request package -- Bid evaluation and project award -- Summary --
4. Scope, schedule, and budget scope -- Overall organization and approach -- Instrumentation -- Electrical -- Controls -- Civil-mechanical-building -- Communications and integration -- Testing -- Training and documentation -- Cutover -- Budget -- Schedule -- Summary --
5. Project staffing -- Defining project resource requirements -- Project organizational chart -- Roles and responsibilities matrix -- Project schedule resourcing -- Extending the project team -- Establishing team communication -- Building an effective team -- Summary --
6. Training -- Engineering -- Maintenance -- Operations -- Others -- Summary --
7. Progress monitoring, change orders, and reporting monitoring -- Scope monitoring -- Schedule tracking -- Budget evaluation -- Overall progress calculations -- Adjusting plans -- Change order management -- Project reporting -- Summary --
8. High-risk areas -- Graphics -- Third-party systems or application communications -- Staffing changes -- Poor teamwork -- Unforeseen logic complexity -- Field construction obstacles -- Cutover details -- Summary --
9. Cutovers -- Correct methodology decision -- Thorough design details -- Comprehensive plan -- Prepared field team -- Control room leadership -- Strong operations coordination -- Complete loop packages -- Efficient checkout process -- Summary --
10. Project closeout and lifecycle management -- Documented completion scope -- Phased financial closing -- Remaining milestones schedule -- Project delivery and acceptance -- Final project review meeting -- Lifecycle management -- Summary --
Supplemental resource list -- Index.
Abstract: Reliable and effective control systems are a critical component of safe and profitable operations across process industries. And many of our industrial facilities today continue to operate using legacy control systems from the past four decades that are at or near the end of their lifecycles. Migration projects to modern control systems are complex, requiring detailed upfront planning, a methodical implementation strategy and astute project management.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Call number Status Date due Barcode Item holds
Ebrary Online Books Ebrary Online Books Colombo Available CBEBK20001419
Ebrary Online Books Ebrary Online Books Jaffna Available JFEBK20001419
Ebrary Online Books Ebrary Online Books Kandy Available KDEBK20001419
Total holds: 0

Enhanced descriptions from Syndetics:

This new book, by the original developer of the BACnet standards, explains how BACnet's protocols manage all basic building functions in a seamless, integrated way.

BACnet is a data communication protocol for building automation and control systems, developed within ASHRAE in cooperation with ANSI and the ISO. This book explains how BACnet works with all major control systems--including those made by Honeywell, Siemens, and Johnson Controls--to manage everything from heating to ventilation to lighting to fire control and alarm systems.

BACnet is used today throughout the world for commercial and institutional buildings with complex mechanical and electrical systems. Contractors, architects, building systems engineers, and facilities managers must all be cognizant of BACnet and its applications. With a real 'seat at the table,' you'll find it easier to understand the intent and use of each of the data sharing techniques, controller requirements, and opportunities for interoperability between different manufacturers' controllers and systems.

Highlights include: * A review of the history of BACnet and its essential features, including the object model, data links, network technologies, and BACnet system configurations; * Comprehensive coverage of services including object access, file access, remote device management, and BACnet-2012's new alarm and event capabilities; * Insight into future directions for BACnet, including wireless networking, network security, the use of IPv6, extensions for lifts and escalators, and a new set of BACnet Web Services; * Extensive reference appendices for all objects and services; and * Acronyms and abbreviations

Includes bibliographical references (pages 187-188) and index.

List of tables and figures -- Acknowledgments -- Foreword -- Preface -- About the author --

1. Migration project justification -- Determining your approach -- Defining ROI -- System failures -- Parts availability or obsolescence issues -- Difficulty integrating with newer applications and systems -- Reduced availability of support services -- Operational inefficiency -- Summary --

2. A comprehensive FEL -- Selecting your FEL resources -- Identifying key engineering deliverables -- Deliverable descriptions and content -- Important FEL decisions -- Summary --

3. Bid specifications and vendor selection -- Control system -- The control system functional specification -- Hardware and software requirements specifications -- Control system bid instructions -- Decision criteria matrix -- Selecting a control system vendor -- Engineering, procurement, and construction services -- Requirements definition -- A complete EPC bid request package -- Bid evaluation and project award -- Summary --

4. Scope, schedule, and budget scope -- Overall organization and approach -- Instrumentation -- Electrical -- Controls -- Civil-mechanical-building -- Communications and integration -- Testing -- Training and documentation -- Cutover -- Budget -- Schedule -- Summary --

5. Project staffing -- Defining project resource requirements -- Project organizational chart -- Roles and responsibilities matrix -- Project schedule resourcing -- Extending the project team -- Establishing team communication -- Building an effective team -- Summary --

6. Training -- Engineering -- Maintenance -- Operations -- Others -- Summary --

7. Progress monitoring, change orders, and reporting monitoring -- Scope monitoring -- Schedule tracking -- Budget evaluation -- Overall progress calculations -- Adjusting plans -- Change order management -- Project reporting -- Summary --

8. High-risk areas -- Graphics -- Third-party systems or application communications -- Staffing changes -- Poor teamwork -- Unforeseen logic complexity -- Field construction obstacles -- Cutover details -- Summary --

9. Cutovers -- Correct methodology decision -- Thorough design details -- Comprehensive plan -- Prepared field team -- Control room leadership -- Strong operations coordination -- Complete loop packages -- Efficient checkout process -- Summary --

10. Project closeout and lifecycle management -- Documented completion scope -- Phased financial closing -- Remaining milestones schedule -- Project delivery and acceptance -- Final project review meeting -- Lifecycle management -- Summary --

Supplemental resource list -- Index.

Restricted to libraries which purchase an unrestricted PDF download via an IP.

Reliable and effective control systems are a critical component of safe and profitable operations across process industries. And many of our industrial facilities today continue to operate using legacy control systems from the past four decades that are at or near the end of their lifecycles. Migration projects to modern control systems are complex, requiring detailed upfront planning, a methodical implementation strategy and astute project management.

Title from PDF title page (viewed on September 28, 2013).

Electronic reproduction. Ann Arbor, MI : ProQuest, 2015. Available via World Wide Web. Access may be limited to ProQuest affiliated libraries.

There are no comments on this title.

to post a comment.